Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Basement to First Floor Size:XS Bunny tails push through cracked

SKU: 99157417867

4.8
USD100.00 USD150.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 16 - Aug 21

Live Spec

Basement to First Floor Size:XS Bunny tails push through crackedA stairwell opening choked with collapsed office chairs, timber boards, and broken furniture, concrete block walls covered floor to ceiling in graffiti tags. This was the basement level of ABBCO Bakery in Leichhardt, photographed in 2015 while the factory sat abandoned. By 1973 the building housed two roll machines producing six thousand dozen rolls per hour. Part of the ABBCO Bakery series.

Store: aashay.com.au · Domain: aashay.com.au

Description

Bunny tails push through cracked concrete in a forgotten corner of the Sundell Holden workshop and service centre on Smith Street

Chemical Storage at Kaga

an authorised Holden dealer (dealer code 610) operating across Sydney's North Shore

Conveyor at Yarraville

The space sits above a site that operated from 1884 until August 1988

Basement to First Floor Size:XS Bunny tails push through crackedA stairwell opening choked with collapsed office chairs, timber boards, and broken furniture, concrete block walls covered floor to ceiling in graffiti tags. This was the basement level of ABBCO Bakery in Leichhardt, photographed in 2015 while the factory sat abandoned. By 1973 the building housed two roll machines producing six thousand dozen rolls per hour. Part of the ABBCO Bakery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products